F-300/2015a Borehole Drilling Log and Pump Test Template (UNHCR, 2015)

Version
Download540
Stock
Total Files2
Size677.69 KB
Create DateJuly 31, 2015
Last UpdatedMay 18, 2018

Publisher: UNHCR
Year: 2015
Description:
This is the standard UNHCR borehole drilling log and pump test template available in PDF and MSWord formats.
WASH actors should ensure that a drilling log, development log, constant discharge pump test, and step drawdown pump test are completed for every borehole installed in the refugee setting. Copies should be kept by the drilling agency, the WASH actor, national regulatory authorities, and UNHCR.

THIS DOCUMENT HAS BEEN SUPERSEDED. PLEASE USE THE UNHCR WELL CONSTRUCTION (EXCEL) TOOL FOR THE WELL LOG AND PUMP TEST DATA. http://wash.unhcr.org/download/unhcr-well-construction/


FileAction
F-300 UNHCR Borehole Drilling Log and Pump Test Template (UNHCR, 2015) - PDF Download 
F-300 UNHCR Borehole Drilling Log and Pump Test Template (UNHCR, 2015) - MSWORD Download