Version | |
Download | 1611 |
Stock | |
Total Files | 3 |
Size | 4.91 MB |
Create Date | December 18, 2015 |
Last Updated | September 14, 2016 |
Publisher: UNHCR
Year: 2015
Description:
This document contains materials to help UNHCR and WASH actors build post emergency concrete handpump aprons with drainage in refugee settings. The package includes:
- Step by Step Construction Drawings
- 2D Technical Drawings
- 3D Google SketchUp Model
- Bills of Quantity
- Material and Workmanship Specifications
- Design Calculations
File | Action |
---|---|
D302 Post Emergency Handpump Apron Design and BoQ (UNHCR, 2015) - PDF | Download |
D302 Post Emergency Handpump Apron Design AutoCAD (UNHCR, 2015) - DWG | Download |
D302 Post Emergency Handpump Apron Sketup 3D Model (UNHCR, 2015) - ZIP | Download |