Version | |
Download | 618 |
Stock | |
Total Files | 1 |
Size | 0.00 KB |
Create Date | April 1, 2016 |
Last Updated | April 7, 2016 |
Publisher: ICRC
Year: 2011
Description:
Constructing, or repairing, boreholes requires specialized knowledge and technical expertise, much of which can be gained from the standard literature; but field operations in remote areas or in difficult conditions often require flexibility and imagination in avoiding and solving technical problems. This review is intended as a decision-making tool to assist in making cost-effective choices between borehole drilling methods, and in deciding whether to drill new boreholes or rehabilitate existing sites.
File | Action |
---|---|
Borehole Drilling and Rehabilitation Under Field Conditions (ICRC, 2011) | Download |