|
D-315/2016a Circular Water Reservoir 10m3 (Reinforced Concrete) Design and BoQ (UNHCR, 2016)
This document contains design drawings for a 10m3 circular water reservoir constructed from bricks and reinforced concrete.
|
|
D-316/2016a Circular Water Reservoir 30m3 (Reinforced Concrete) Design and BoQ (UNHCR, 2016)
This document contains design drawings for a 30m3 circular water reservoir constructed from bricks and reinforced concrete.
|
|
D-314/2016a Square Water Reservoir 50m3 (Reinforced Concrete) Design and BoQ (UNHCR, 2016)
This document contains design drawings for a 50m3 square water reservoir constructed from reinforced concrete.
|
|
D-313/2016a Square Water Reservoir 30m3 (Reinforced Concrete) Design and BoQ (UNHCR, 2016)
This document contains design drawings for a 30m3 square water reservoir constructed from reinforced concrete.
|
|
D-312/2016a Square Water Reservoir 10m3 (Reinforced Concrete) Design and BoQ (UNHCR, 2016)
This document contains design drawings for a 10m3 square water reservoir constructed from reinforced concrete.
|
|
UNHCR WASH MANUAL: Programme Guidance
The UNHCR WASH Manual: Programme Guidance, provides practical guidance for WASH programmes in refugee settings.
Tags: Camp Closure, camp management, Capacity Building, CASH Interventions, Child Friendly Facilities, Cold Climates, Cross Cutting, Disability, Environment, Gender, Gender Based Violence, Human Right to Water / Sanitation, Protection, Value for Money, WASH Assessments, WASH Coordination, WASH Monitoring, WASH Programme Health and Safety, WASH Programme Management, WASH Reporting, and WASH Strategy Development. Categories: WASH Manual, WASH Operational Guidelines, and WASH Policy Guidelines.
|
|
D-320/2016a Circular Water Reservoir 90m3 (Ferrocement) Design and BoQ (UNHCR, 2016)
This document contains design drawings for a 90m3 circular water reservoir constructed from ferrocement.
|
|
D-319/2016a Circular Water Reservoir 75m3 (Ferrocement) Design and BoQ (UNHCR, 2016)
This document contains design drawings for a 75m3 circular water reservoir constructed from ferrocement.
|
|
D-318/2016a Circular Water Reservoir 45m3 (Ferrocement) Design and BoQ (UNHCR, 2016)
This document contains design drawings for a 45m3 circular water reservoir constructed from ferrocement.
Tags: Piped Water Networks, Piped Water Networks, Piped Water Networks, Piped Water Networks, Piped Water Networks, Piped Water Networks, Piped Water Networks, Piped Water Networks, Water Storage, Water Storage, Water Storage, Water Storage, Water Storage, Water Storage, Water Storage, Water Storage, Water Supply, Water Supply, Water Supply, Water Supply, Water Supply, Water Supply, Water Supply, and Water Supply. Languages: English, English, English, English, English, English, English, English, and English. Organisations: UNHCR, UNHCR, UNHCR, UNHCR, UNHCR, UNHCR, UNHCR, UNHCR, and UNHCR. Categories: WASH Reference Documents, WASH Reference Documents, WASH Reference Documents, WASH Reference Documents, WASH Reference Documents, WASH Reference Documents, WASH Reference Documents, WASH Technical Designs, WASH Technical Designs, WASH Technical Designs, WASH Technical Designs, WASH Technical Designs, WASH Technical Designs, WASH Technical Designs, and WASH Technical Designs.
|