Menu

KAP ACTED Rapid WASH Infrastructure Assessment

Télécharger  (PDF, 806.77 KB)
Type de document: Evaluations
Type de document: English
Date de publication: 4 January 2018 (il y a 5 mois)
Créé: 4 January 2018 (il y a 5 mois)
Téléchargements: 88

KAP ACTED Rapid WASH Infrastructure Assessment

Type de document: Evaluations
Langue(s): English
KAP ACTED Rapid WASH Infrastructure Assessment

Partners

  • Agency for Technical Cooperation and Development

Emplacements

  • Jordan
  • Irbid Governorate
  • King Abdullah Park Refugee Camp
  • Syrian Arab Republic

Groupe de population

Pays Groupes
Unknown Syrian Arab Republic - Refugees
document.single.download  (PDF, 806.77 KB)