This document contains materials to help UNHCR and WASH actors convert 20ft shipping containers into WASH Blocks (14 sinks) with drainage.
Archives
D-702/2016a WASH Block – 20ft Container Conversion (Sinks Only) Design and BoQ (UNHCR, 2016)
D-317/2016a Circular Water Reservoir 50m3 (Reinforced Concrete) Design and BoQ (UNHCR, 2016)
This document contains design drawings for a 50m3 circular water reservoir constructed from bricks and reinforced concrete.
D-315/2016a Circular Water Reservoir 10m3 (Reinforced Concrete) Design and BoQ (UNHCR, 2016)
This document contains design drawings for a 10m3 circular water reservoir constructed from bricks and reinforced concrete.
D-316/2016a Circular Water Reservoir 30m3 (Reinforced Concrete) Design and BoQ (UNHCR, 2016)
This document contains design drawings for a 30m3 circular water reservoir constructed from bricks and reinforced concrete.
D-314/2016a Square Water Reservoir 50m3 (Reinforced Concrete) Design and BoQ (UNHCR, 2016)
This document contains design drawings for a 50m3 square water reservoir constructed from reinforced concrete.
D-313/2016a Square Water Reservoir 30m3 (Reinforced Concrete) Design and BoQ (UNHCR, 2016)
This document contains design drawings for a 30m3 square water reservoir constructed from reinforced concrete.
D-312/2016a Square Water Reservoir 10m3 (Reinforced Concrete) Design and BoQ (UNHCR, 2016)
This document contains design drawings for a 10m3 square water reservoir constructed from reinforced concrete.
UNHCR WASH MANUAL: Programme Guidance
The UNHCR WASH Manual: Programme Guidance, provides practical  guidance for WASH programmes in refugee settings.
- Tags: Camp Closure, Capacity Building, CASH Interventions, Child Friendly Facilities, Cold Climates, Disability, Environment, Gender, Gender Based Violence, Human Right to Water / Sanitation, Protection, Value for Money, WASH Assessments, WASH Coordination, WASH Monitoring, WASH Programme Health and Safety, WASH Programme Management, WASH Reporting, and WASH Strategy Development. Categories: WASH Manual, WASH Operational Guidelines, and WASH Policy Guidelines.
D-318/2016a Circular Water Reservoir 45m3 (Ferrocement) Design and BoQ (UNHCR, 2016)
This document contains design drawings for a 45m3 circular water reservoir constructed from ferrocement.
- Tags: Piped Water Networks, Piped Water Networks, Piped Water Networks, Piped Water Networks, Piped Water Networks, Piped Water Networks, Piped Water Networks, Water Storage, Water Storage, Water Storage, Water Storage, Water Storage, Water Storage, Water Storage, Water Supply, Water Supply, Water Supply, Water Supply, Water Supply, Water Supply, Water Supply, and Water Supply. Organisations: UNHCR, UNHCR, UNHCR, UNHCR, UNHCR, UNHCR, UNHCR, UNHCR, and UNHCR. Categories: WASH Technical Designs, WASH Technical Designs, WASH Technical Designs, WASH Technical Designs, WASH Technical Designs, WASH Technical Designs, WASH Technical Designs, and WASH Technical Designs.
Camp Management Toolkit (NRC, 2008)
These guidelines explain what is camp management; the roles and responsibilities of different stakeholders; the importance of community participation and involvement; the importance of good coordination and coordination mechanisms; the importance of information management and data analysis; guidelines for registration and profiling; guidelines related to shelter, NFI distributions, health, water and sanitation, domestic energy, education, agriculture, livelihoods, protection and gender based violence activities; and guidelines for camp setup and closure.
- Tags: camp management, camp management, Cross Cutting, and Cross Cutting. Languages: English, English, English, English, English, English, English, English, English, and English. Organisations: NRC.