Archives

D-308/2015a Emergency Raised Water Platform (Corrugated Steel Rings) Design and BoQ (UNHCR, 2015)

This document contains materials to help UNHCR and WASH actors construct emergency raised water platforms in refugee settings. The package includes: Technical Drawings; Step by Step Construction Drawings; Bills of Quantity; Material and Workmanship Specifications; and Design Calculations.

D-304/2015a Post Emergency Borehole Design (Fractured Rock Aquifer)

This document contains a simplified design to help UNHCR and WASH actors design drilled boreholes (fractured rock) in refugee settings. The package includes: Technical Drawings; Step by Step Construction Drawings; Bills of Quantity; Material and Workmanship Specifications; and Design Calculations.

F-401/2016a Septic Tank Sizing Spreadsheet (UNHCR, 2016)

This sizing calculation tool has been designed to assist UNHCR and WASH actors correctly size septic tanks in displaced settings taking into account numbers of users, wastewater and sewage flows, sludge and scum accumulation rates, desludging periods, liquid retention times, and average annual ambient temperatures.

D405-2015a Emergency Desludgable (Raised with Holding Tanks) Latrine Design and BoQ (UNHCR, 2015)

This document contains documentation to help UNHCR and WASH actors build emergency raised desludgable latrines in refugee settings. The package includes: Technical Drawings; Step by Step Construction Drawings; Bills of Quantity; Material and Workmanship Specifications; and Design Calculations.