Archives

F-11/2015a UNHCR WASH Universal Access Checklist (UNHCR, 2015)

F-11

This document has been designed to help UNHCR and WASH actors assess WASH infrastructure for potential access from the individual perspective of each type of vulnerable user in particular persons with disabilities, women, children, and the elderly.

WASH Winterization Technical Brief (UNHCR, 2015)

WASH Winterization

This technical brief is intended to provide guidance for UNHCR staff and Partners involved in winterization of WASH facilities in the current European refugee and migrant situation.

UNHCR Sample ToRs for Hydrogeological Surveying (UNHCR, 2015)

UNHCR Terms of Reference Hydrogeological Study

These sample terms of reference may be used should WASH actors working in refugee settings with to engage the services of a Consultant to carry out hydrogeological surveys of pre-selected areas. The terms of reference cover the following areas…
Evaluating the groundwater situation based on compilation of existing relevant data (e.g. drilling logs) with additional classical hydrogeological field data collection (e.g. survey of water points, water levels, water quality) leading to the identification of favourable exploration zones
Carrying out groundwater exploratory field geophysical investigations to identify exact drilling locations, and
Supervising the drilling process and on the spot reporting on the progress.

D-31/2015a Post Emergency Tapstand Design and BoQ (UNHCR, 2015)

D31 Post Emergency Tapstandv2

This document contains documentation to help UNHCR and WASH actors install post emergency concrete tapstands in refugee settings. The package includes: Technical Drawings; Step by Step Construction Drawings; Bills of Quantity; Material and Workmanship Specifications; and Design Calculations.

D-30/2015a Emergency Tapstand (Wooden Pallets) Design and BoQ (UNHCR, 2015)

D30v2

This document contains documentation to help UNHCR and WASH actors install emergency tapstands (wooden pallet) in refugee settings. The package includes: Technical Drawings and Step by Step Construction Drawings.

D-32/2015a Post Emergency Handpump Apron Design and BoQ (UNHCR, 2015)

D32 v2

This document contains documentation to help UNHCR and WASH actors install post emergency concrete handpump aprons in refugee settings. The package includes: Technical Drawings; Step by Step Construction Drawings; Bills of Quantity; Material and Workmanship Specifications; and Design Calculations.

Refugee WASH Standards and Indicators (UNHCR, 2015)

WASH Standards and indicators, December 2015

A summary of UNHCR water, excreta management, solid waste management, disease vector control and hygiene promotion standards and indicators for emergency and post emergency refugee settings including means of verification.

D-33/2015a Post Emergency Hand Dug Well Apron (UNHCR, 2015)

D33 Thumb1

This document contains materials to help UNHCR and WASH actors construct hand dug well aprons in refugee settings.The package includes: Technical Drawings; Step by Step Construction Drawings; Bills of Quantity; Material and Workmanship Specifications; and Design Calculations.

D-36/2015a Emergency Raised Water Platform (Sandbags) Design and BoQ (UNHCR, 2015)

D36 Thumb1

This document contains materials to help UNHCR and WASH actors construct emergency raised water platforms (sandbags) in refugee settings. The package includes: Technical Drawings; Step by Step Construction Drawings; Bills of Quantity; Material and Workmanship Specifications; and Design Calculations.

D-37/2015a Emergency Raised Water Platform (Concrete Rings) Design and BoQ (UNHCR, 2015)

D37 Thumb1

This document contains materials to help UNHCR and WASH actors construct emergency raised water platforms in refugee settings. The package includes: Technical Drawings; Step by Step Construction Drawings; Bills of Quantity; Material and Workmanship Specifications; and Design Calculations.