Archives

F-80/2015a Sample WASH Staffing Structure for Post Emergency Camp Setting (UNHCR, 2015)

F-80 Thumb WASH Organigram

A sample organigram for running a typical refugee WASH programme for 20,000 people in a post emergency camp based setting. The organigram gives an indication of how the WASH Team should be structured in addition to the tentative number of Coordinators, Team Leaders, Officer, and Assistant level staff that should be recruited.

F-32/2015a Well Cleaning and Chlorination Log Sheet (UNHCR, 2015)

F32 - Thumb - Well Cleaning and Chlorination Log Sheet

This is the standard UNHCR well cleaning and chlorination template for refugee settings available in PDF and MSExcel formats. The form should be completed each time a hand dug well is cleaned, chlorinated and tested for faecal coliforms. The form is available in MSExcel format so WASH actors can adapt the content to the context.

F-31/2015a Sample Drilling Contract for Refugee Settings (UNHCR, 2015)

F31 Thumb - Sample Drilling Contract

This is the standard UNHCR borehole drilling contract template for refugee settings available in PDF and MSWord formats. The contract also includes a technical specification for drilling which defines the following borehole construction requirements: drillpipe diameters; casings and screens; hydrogeological survey; identification of drilling sites; abandoned boreholes; drilling equipment and depths; plumbness and alignment; temporary lid; artificial and natural gravel pack; well development; sanitary seal; pumping tests; borehole yields; borehole pollution; borehole disinfection; and water samples.

F-53/2015a UNHCR Landfill Waste Register (UNHCR, 2015)

F53 Thumb - UNHCR Landfill Waste Register

UNHCR field staff and their partners should use this waste register form to keep a record of the types and quantities of waste being disposed at each landfill facility. Ideally waste management short, medium and long term strategies for different waste streams should be re-evaluated and re-organised based on the data collected from this tool.

F-41/2016a Septic Tank Sizing Spreadsheet (UNHCR, 2016)

F41 Septic Tank Sizing Calculator Thumb

This sizing calculation tool has been designed to assist UNHCR and WASH actors correctly size septic tanks in displaced settings taking into account numbers of users, wastewater and sewage flows, sludge and scum accumulation rates, desludging periods, liquid retention times, and average annual ambient temperatures.

F-20/2015a Summary of Important WASH Diseases in Refugee Settings (UNHCR, 2015)

F-20

This document provides a quick summary of the most important WASH related diseases for refugee settings and includes a list of recommended control strategies.

F-15/2015a Site Level Refugee WASH Operational Plan Template (UNHCR, 2015)

F-15

This template can be used to help UNHCR and WASH actors establish a simple WASH operational plan (WHO will do WHAT, WHERE, WHEN, and HOW and WHO will PAY and WHO will MONITOR). This template can be used in addition to the site level WASH Strategy Template.

UNHCR Global Strategy for Public Health 2014 – 2018 (UNHCR, 2014)

UNHCR Global Strategy for Public Health 2014 - 2018 (UNHCR, 2014)

This document describes UNHCR’s global strategy for public health through a set of guiding principles and strategic approaches including protection; age, gender and diversity; equity; access; sustainability; community empowerment; appropriateness and reliability; partnerships and coordination; capacity building; communication and advocacy; integrated approaches; measurement and monitoring; and innovation. The document describes strategic objectives and enabling actions per sub-sector (Public Health, HIV and Reproductive Health, Food Security and Nutrition, and WASH).

D44-2015a Emergency Raised Desludgable Latrine Design and BoQ (UNHCR, 2015)

D44 Thumb1

This document contains documentation to help UNHCR and WASH actors build emergency raised desludgable latrines in refugee settings. The package includes: Technical Drawings; Step by Step Construction Drawings; Bills of Quantity; Material and Workmanship Specifications; and Design Calculations.